Work has been completed on the reconstruction of an existing service road at the Coca Cola production plant Wakefield. The work required a close working relationship with the client to ensure the works were completed on time and without disruption to the operations at this very busy site.

The contract was managed successfully by Brian France who led the team and ensured safety standards and quality were maintained throughout to the satisfaction of the client.