Following successful contract negotiations Peter Duffy Limited were appointed by the client Celotex, who were acting as Construction Managers, to carry out the groundworks and external works associated with a 16000m2 production and distribution facility for its insulation products.

Main Description of Works:

  • Installation of a foul and surface water drainage system and associated pumping stations, attenuation tank, separator tanks, land drainage and the diversion of a surface water rising main.
  • 12,000m2 external concrete hardstanding.
  • Installation of a 16,000m2 internal polished concrete floor slab.
  • Installation of utility services and associated ducting works.
  • Installation of temporary rising main.
  • Concrete pad foundations.
  • Various reinforced concrete structures.
  • Kerbing, hard landscaping and surfacing works,¬†entrance road and car parks.
  • Top soiling and soft landscaping.
  • Contract location: Eggborough, East Yorkshire
  • Final value: ¬£3.2m