Friday 29 July, 2016
Old Whittington Wind Turbine Generator
Works are well underway at Old Whittington where Peter Duffy Limited is acting as Principal Contractor and Designer for the design and construction of a single wind turbine on behalf of Kelda Energy. Final preparations are being made on site,